1t/D Wastewater Treatment Plant A2o Sewage Treatment Plant Mbbr Filler FRP Tank

Product Details
Customization: Available
Certification: ISO9001
Application: Household
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

In-stock Capacity
The supplier has In-stock capacity
Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
Standardized quality control
The supplier has a complete and standardized quality control process, check the Audit Report for more information
Management Certification
The supplier has quality management system certification, including:
ISO45001:2018 certificate
ISO9001:2015 certificate
ISO14001
to see all verified strength labels (33)
  • 1t/D Wastewater Treatment Plant A2o Sewage Treatment Plant Mbbr Filler FRP Tank
  • 1t/D Wastewater Treatment Plant A2o Sewage Treatment Plant Mbbr Filler FRP Tank
  • 1t/D Wastewater Treatment Plant A2o Sewage Treatment Plant Mbbr Filler FRP Tank
  • 1t/D Wastewater Treatment Plant A2o Sewage Treatment Plant Mbbr Filler FRP Tank
  • 1t/D Wastewater Treatment Plant A2o Sewage Treatment Plant Mbbr Filler FRP Tank
  • 1t/D Wastewater Treatment Plant A2o Sewage Treatment Plant Mbbr Filler FRP Tank
Find Similar Products
  • Overview
  • What differences between septic tank and sewage treatment plant
  • Product Description
  • Specification
  • Company Profile
  • Certifications
  • Packaging Logistics
  • FAQ
Overview

Basic Info.

Model NO.
XYD-JHC-001
Productivity
1000L/D
Weight (Kg)
110 Kg
Condition
New
Warranty
1 Year
Size
1950*1170*1080mm
Feature
Eco-Friendly Easy Operation
Core Components
Blower, A2o, PLC
Technology
Anoxic/Oxic and Mbr
Power
38-350W
Transport Package
Wooden Box
Specification
FRP Materials
Trademark
New YuDa
Origin
Guangxi, China
HS Code
8421219090
Production Capacity
1000set/Year

Product Description

What differences between septic tank and sewage treatment plant

Septic Tanks & Sewage Plants - What's The Difference?

Septic tanks and sewage treatment systems serve the same purpose to the extent that they both provide buildings, that don't have access to mains sewers, with a way to process their wastewater. Despite their similarities, they do have some distinct differences.
1t/D Wastewater Treatment Plant A2o Sewage Treatment Plant Mbbr Filler FRP Tank

What Is A Septic Tank?

As you can see in the diagram above, septic tanks are normally buried underground and are split into
multiple chambers. Wastewater enters one end of the septic tank, before being separated into solids (sludge) and oils (scum). The separated wastewater (effluent) then leaves the septic tank via an outlet and goes into a drainage field. 
Once the water leaves the outlet pipe and has gone into the drainage field, the effluent is percolated
through the ground to remove bacteria, before being dispersed and rejoining watercourses.
1t/D Wastewater Treatment Plant A2o Sewage Treatment Plant Mbbr Filler FRP Tank

How Does A Sewage Treatment Plant Work?

Although sewage treatment plants perform the same function as a septic tank, it does it in a different
way. Rather than just separating the sludge and scum from the wastewater, a sewage treatment plant uses a pump to aerate the chamber. This process encourages the growth of 'good' bacteria that will help to break down the harmful bacteria that's in the wastewater. Once this process has been completed, the liquid water can be released from the plant directly into watercourses, such as streams.

Key Differences

In terms of the process, the key difference between a septic tank and a sewage treatment plant is that a sewage treatment plant purifies the effluent before it is released, meaning that it can be released into streams without the need for further filtering.
Aside from the cleanliness of the effluent, there are also a number of other differences.
* Sewage treatment plants require electricity to run the air pump, however septic tanks can run power-free
* Septic tanks don't require servicing (although they do require emptying), whereas sewage treatment plants require servicing and emptying
* Septic tanks generally require emptying more frequently than sewage treatment plants
Product Description
1T/D Wastewater Treatment Plant A2O Sewage Treatment Plant MBBR Filler FRP Tank
1t/D Wastewater Treatment Plant A2o Sewage Treatment Plant Mbbr Filler FRP Tank
1t/D Wastewater Treatment Plant A2o Sewage Treatment Plant Mbbr Filler FRP Tank

Usage scenarios 
1.Sewage treatment of closed and semi-closed sensitive water bodies 
2. Domestic sewage treatment in scenic spots;  
3.Suburban point source sewage treatment; 4.Sewage treatment in drinking water source protection areas and ecological protection areas. 
5. Contiguous improvement of rural environment; Water reuse in hotels, guesthouses, etc.;
Farmers' domestic sewage (usually including kitchen wastetoilet flushing sewage and laundry water, of which the toilet flushing sewage must be deposited in a septic tank) is collected through the pipe network and then enters the purification tank. Most of the pollutants in the water are discharged out. Use a fecal suction truck to pump out part of the sludge and sediment at the bottom of the sedimentation tank every 3-6 months.
 
1t/D Wastewater Treatment Plant A2o Sewage Treatment Plant Mbbr Filler FRP Tank
1t/D Wastewater Treatment Plant A2o Sewage Treatment Plant Mbbr Filler FRP Tank
1t/D Wastewater Treatment Plant A2o Sewage Treatment Plant Mbbr Filler FRP Tank
Specification
Purification Tank 
Details Specification
 
 
Capacity
1m³/d
2m³/d
5m³/d
Size
2400×1300×1400mm
2130x1150x1650mm
2420x2010x2000mm
Weight
180kg
200kg
520kg
Thickness
6-7mm
6-7mm
7mm
Raw Material 
SMC molded FRP Equipment
 
 
Included System
Including equipment body, packing, aeration system, reflow system, etc
 
 
 
Company Profile
1t/D Wastewater Treatment Plant A2o Sewage Treatment Plant Mbbr Filler FRP Tank
NEW YUDA Environmental Protection Technology Co., Ltd. is a comprehensive environmental protection enterprise integrating consulting and design, equipment manufacturing, construction, investment and financing, and operation and maintenance management. Its business areas focus on urban and rural environmental governance, industrial and service wastewater treatment, and water supply purification, solid waste treatment and environmental services. The company is committed to providing overall environmental solutions for local governments' rural revitalization strategic projects and enterprises.
1t/D Wastewater Treatment Plant A2o Sewage Treatment Plant Mbbr Filler FRP Tank
1t/D Wastewater Treatment Plant A2o Sewage Treatment Plant Mbbr Filler FRP Tank

1) National Hi-tech Enterprise, Guangxi Famous Brand, Class A Credit Enterprise
2) More than 60 intellectual property rights, including trademarks, software copyrights, utility and invention patents.
3) Strong technical ability, cooperate with Tsinghua University, Tianjin University, Tokyo University,etc.
4) More then 15 years experiences in the industry
5) General contracting qualification of municipal public works construction. Professional contracting qualification of environmental protection engineering

 
1t/D Wastewater Treatment Plant A2o Sewage Treatment Plant Mbbr Filler FRP Tank
1t/D Wastewater Treatment Plant A2o Sewage Treatment Plant Mbbr Filler FRP Tank
1t/D Wastewater Treatment Plant A2o Sewage Treatment Plant Mbbr Filler FRP Tank
Certifications
1t/D Wastewater Treatment Plant A2o Sewage Treatment Plant Mbbr Filler FRP Tank
Packaging Logistics
1t/D Wastewater Treatment Plant A2o Sewage Treatment Plant Mbbr Filler FRP Tank
1t/D Wastewater Treatment Plant A2o Sewage Treatment Plant Mbbr Filler FRP Tank
1t/D Wastewater Treatment Plant A2o Sewage Treatment Plant Mbbr Filler FRP Tank
1t/D Wastewater Treatment Plant A2o Sewage Treatment Plant Mbbr Filler FRP Tank
FAQ
1. What can you buy from us?
Sewage Treatment Equipment / Water Purifier / Water Purification and so on
2. What service can we provide?
Payment Terms:EXW; FOB; CIF and so on
Payment Way:T/T; L/C
3. What's your delivery time?
Based on different equipment, there is different delivery time.
Usually 7-18 days for reference.
More information feel free to contact :
 
 
Before providing details quotation, please kindly help to confirm below details:
1. What's your daily water treatment volume (T)? 2. Is the equipment used to treat domestic sewage or industrial sewage? 3. How many people use? / and where is the use scene? 4. Is there a water ingress test report? 5. What are the requirements for effluent and local discharge standards?
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier